Zuntong Wang, Fei Qiao, Qidi Wu. Scheduling Semiconductor Wafer Fabrication with Optimization of Multiple objectives. In 2006 IEEE International Conference on Automation Science and Engineering, Shanghai, China, 7-10 October 2006. pages 253-258, IEEE, 2006. [doi]
@inproceedings{WangQW06-0, title = {Scheduling Semiconductor Wafer Fabrication with Optimization of Multiple objectives}, author = {Zuntong Wang and Fei Qiao and Qidi Wu}, year = {2006}, doi = {10.1109/COASE.2006.326889}, url = {http://dx.doi.org/10.1109/COASE.2006.326889}, researchr = {https://researchr.org/publication/WangQW06-0}, cites = {0}, citedby = {0}, pages = {253-258}, booktitle = {2006 IEEE International Conference on Automation Science and Engineering, Shanghai, China, 7-10 October 2006}, publisher = {IEEE}, isbn = {1-4244-0310-3}, }