Adaptive scheduling for assembly job shop with uncertain assembly times based on dual Q-learning

Haoxiang Wang, Bhaba R. Sarker, Jing Li, Jian Li. Adaptive scheduling for assembly job shop with uncertain assembly times based on dual Q-learning. Int. J. Prod. Res., 59(19):5867-5883, 2021. [doi]

@article{WangSLL21-1,
  title = {Adaptive scheduling for assembly job shop with uncertain assembly times based on dual Q-learning},
  author = {Haoxiang Wang and Bhaba R. Sarker and Jing Li and Jian Li},
  year = {2021},
  doi = {10.1080/00207543.2020.1794075},
  url = {https://doi.org/10.1080/00207543.2020.1794075},
  researchr = {https://researchr.org/publication/WangSLL21-1},
  cites = {0},
  citedby = {0},
  journal = {Int. J. Prod. Res.},
  volume = {59},
  number = {19},
  pages = {5867-5883},
}