Haoxiang Wang, Bhaba R. Sarker, Jing Li, Jian Li. Adaptive scheduling for assembly job shop with uncertain assembly times based on dual Q-learning. Int. J. Prod. Res., 59(19):5867-5883, 2021. [doi]
@article{WangSLL21-1, title = {Adaptive scheduling for assembly job shop with uncertain assembly times based on dual Q-learning}, author = {Haoxiang Wang and Bhaba R. Sarker and Jing Li and Jian Li}, year = {2021}, doi = {10.1080/00207543.2020.1794075}, url = {https://doi.org/10.1080/00207543.2020.1794075}, researchr = {https://researchr.org/publication/WangSLL21-1}, cites = {0}, citedby = {0}, journal = {Int. J. Prod. Res.}, volume = {59}, number = {19}, pages = {5867-5883}, }