An energy-efficient two-stage hybrid flow shop scheduling problem in a glass production

Shijin Wang, Xiaodong Wang, Feng Chu, Jianbo Yu. An energy-efficient two-stage hybrid flow shop scheduling problem in a glass production. Int. J. Prod. Res., 58(8):2283-2314, 2020. [doi]

Authors

Shijin Wang

This author has not been identified. Look up 'Shijin Wang' in Google

Xiaodong Wang

This author has not been identified. Look up 'Xiaodong Wang' in Google

Feng Chu

This author has not been identified. Look up 'Feng Chu' in Google

Jianbo Yu

This author has not been identified. Look up 'Jianbo Yu' in Google