Hui-Ming Wee, Wan-Tsu Wang, Leopoldo Eduardo Cárdenas-Barrón. An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders. Computers & Industrial Engineering, 64(2):748-755, 2013. [doi]
@article{WeeWC13, title = {An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders}, author = {Hui-Ming Wee and Wan-Tsu Wang and Leopoldo Eduardo Cárdenas-Barrón}, year = {2013}, doi = {10.1016/j.cie.2012.11.005}, url = {http://dx.doi.org/10.1016/j.cie.2012.11.005}, researchr = {https://researchr.org/publication/WeeWC13}, cites = {0}, citedby = {0}, journal = {Computers & Industrial Engineering}, volume = {64}, number = {2}, pages = {748-755}, }