An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders

Hui-Ming Wee, Wan-Tsu Wang, Leopoldo Eduardo Cárdenas-Barrón. An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders. Computers & Industrial Engineering, 64(2):748-755, 2013. [doi]

@article{WeeWC13,
  title = {An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders},
  author = {Hui-Ming Wee and Wan-Tsu Wang and Leopoldo Eduardo Cárdenas-Barrón},
  year = {2013},
  doi = {10.1016/j.cie.2012.11.005},
  url = {http://dx.doi.org/10.1016/j.cie.2012.11.005},
  researchr = {https://researchr.org/publication/WeeWC13},
  cites = {0},
  citedby = {0},
  journal = {Computers & Industrial Engineering},
  volume = {64},
  number = {2},
  pages = {748-755},
}