Two-machine flow-shop scheduling with equal processing time on the second machine for minimizing total weighted completion time

Hongjun Wei, Jinjiang Yuan. Two-machine flow-shop scheduling with equal processing time on the second machine for minimizing total weighted completion time. Oper. Res. Lett., 47(1):41-46, 2019. [doi]

@article{WeiY19-0,
  title = {Two-machine flow-shop scheduling with equal processing time on the second machine for minimizing total weighted completion time},
  author = {Hongjun Wei and Jinjiang Yuan},
  year = {2019},
  doi = {10.1016/j.orl.2018.12.002},
  url = {https://doi.org/10.1016/j.orl.2018.12.002},
  researchr = {https://researchr.org/publication/WeiY19-0},
  cites = {0},
  citedby = {0},
  journal = {Oper. Res. Lett.},
  volume = {47},
  number = {1},
  pages = {41-46},
}