A novel elevator group control scheduling algorithm based on pseudo differential feedback

Sheng Wu, Guifang Wu. A novel elevator group control scheduling algorithm based on pseudo differential feedback. In 2012 IEEE International Conference on Automation and Logistics, Zhengzhou, China, August 15-17, 2012. pages 111-115, IEEE, 2012. [doi]

@inproceedings{WuW12-18,
  title = {A novel elevator group control scheduling algorithm based on pseudo differential feedback},
  author = {Sheng Wu and Guifang Wu},
  year = {2012},
  doi = {10.1109/ICAL.2012.6308180},
  url = {http://dx.doi.org/10.1109/ICAL.2012.6308180},
  researchr = {https://researchr.org/publication/WuW12-18},
  cites = {0},
  citedby = {0},
  pages = {111-115},
  booktitle = {2012 IEEE International Conference on Automation and Logistics, Zhengzhou, China, August 15-17, 2012},
  publisher = {IEEE},
  isbn = {978-1-4673-0362-0},
}