Optimization for Multi-Resources-Constrained Job Shop Scheduling Based on Three-level Heuristic Algorithm

Xiaoying Xi, Lili Jiang, Qiang Zhang. Optimization for Multi-Resources-Constrained Job Shop Scheduling Based on Three-level Heuristic Algorithm. In 2009 International Asia Conference on Informatics in Control, Automation and Robotics, CAR 2009, Bangkok, Thailand, 1-2 February 2009. pages 296-300, IEEE Computer Society, 2009. [doi]

Authors

Xiaoying Xi

This author has not been identified. Look up 'Xiaoying Xi' in Google

Lili Jiang

This author has not been identified. Look up 'Lili Jiang' in Google

Qiang Zhang

This author has not been identified. Look up 'Qiang Zhang' in Google