A fuzzy random resource-constrained scheduling model with multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project

Jiuping Xu, Zhe Zhang. A fuzzy random resource-constrained scheduling model with multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project. J. Scheduling, 15(2):253-272, 2012. [doi]

@article{XuZ12-1,
  title = {A fuzzy random resource-constrained scheduling model with multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project},
  author = {Jiuping Xu and Zhe Zhang},
  year = {2012},
  doi = {10.1007/s10951-010-0173-1},
  url = {http://dx.doi.org/10.1007/s10951-010-0173-1},
  researchr = {https://researchr.org/publication/XuZ12-1},
  cites = {0},
  citedby = {0},
  journal = {J. Scheduling},
  volume = {15},
  number = {2},
  pages = {253-272},
}