Jiuping Xu, Zhe Zhang. A fuzzy random resource-constrained scheduling model with multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project. J. Scheduling, 15(2):253-272, 2012. [doi]
@article{XuZ12-1, title = {A fuzzy random resource-constrained scheduling model with multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project}, author = {Jiuping Xu and Zhe Zhang}, year = {2012}, doi = {10.1007/s10951-010-0173-1}, url = {http://dx.doi.org/10.1007/s10951-010-0173-1}, researchr = {https://researchr.org/publication/XuZ12-1}, cites = {0}, citedby = {0}, journal = {J. Scheduling}, volume = {15}, number = {2}, pages = {253-272}, }