The following publications are possibly variants of this publication:
- Scheduling deteriorating jobs on a single machine subject to breakdownsXiaoqiang Cai, Xianyi Wu, Xian Zhou. scheduling, 14(2):173-186, 2011. [doi]
- Single Machine Two-Agent Scheduling with Deteriorating JobsZhenyou Wang, Cai-Min Wei, Yu-Bin Wu. apjor, 33(5):1-17, 2016. [doi]
- Two-agent scheduling on unrelated parallel machines with total completion time and weighted number of tardy jobs criteriaYunqiang Yin, Youhua Chen, Kaida Qin, Dujuan Wang. scheduling, 22(3):315-333, 2019. [doi]
- Batch scheduling of step deteriorating jobsM. S. Barketau, T. C. Edwin Cheng, C. T. Ng, Vladimir Kotov, Mikhail Y. Kovalyov. scheduling, 11(1):17-28, 2008. [doi]