The following publications are possibly variants of this publication:
- Minimizing Total Completion Time Subject to Job Release Dates and Preemption PenaltiesZhaohui Liu, T. C. Edwin Cheng. scheduling, 7(4):313-327, 2004. [doi]
- Two-agent single-machine scheduling with release dates and preemption to minimize the maximum latenessJ. J. Yuan, C. T. Ng, T. C. Edwin Cheng. scheduling, 18(2):147-153, 2015. [doi]
- Pareto optimization of rescheduling with release dates to minimize makespan and total sequence disruptionQiulan Zhao, Jinjiang Yuan. scheduling, 16(3):253-260, 2013. [doi]
- Single machine batch scheduling problem with family setup times and release dates to minimize makespanJ. J. Yuan, Zhaohui Liu, C. T. Ng, T. C. Edwin Cheng. scheduling, 9(6):499-513, 2006. [doi]