A late acceptance hill-climbing algorithm for balancing two-sided assembly lines with multiple constraints

Biao Yuan, Chaoyong Zhang, Xinyu Shao. A late acceptance hill-climbing algorithm for balancing two-sided assembly lines with multiple constraints. J. Intelligent Manufacturing, 26(1):159-168, 2015. [doi]

@article{YuanZS15,
  title = {A late acceptance hill-climbing algorithm for balancing two-sided assembly lines with multiple constraints},
  author = {Biao Yuan and Chaoyong Zhang and Xinyu Shao},
  year = {2015},
  doi = {10.1007/s10845-013-0770-x},
  url = {http://dx.doi.org/10.1007/s10845-013-0770-x},
  researchr = {https://researchr.org/publication/YuanZS15},
  cites = {0},
  citedby = {0},
  journal = {J. Intelligent Manufacturing},
  volume = {26},
  number = {1},
  pages = {159-168},
}