477 | -- | 486 | V. Sridharan, R. Lawrence LaForge. A model to estimate service levels when a portion of the master production schedule is frozen |
487 | -- | 498 | Ahmet Bolat, Mehmet Savsar, Mohammed A. Al-Fawzan. Algorithms for real-time scheduling of jobs on mixed model assembly lines |
499 | -- | 510 | X. Cai, C. J. Goh. A fast heuristic for the train scheduling problem |
511 | -- | 519 | Jianzhong Zhang, Dan Sha. A priority measure in interval methods for constrained global optimization |
521 | -- | 533 | Jeffrey L. Riggs, Sheila B. Brown, Robert P. Trueblood. Integration of technical, cost, and schedule risks in project management |
535 | -- | 541 | William Hurley. Adjacent vertex simplex algorithms: More experimental results on random problems |
543 | -- | 556 | Zilla Sinuany-Stern, Abraham Mehrez, Arieh Barboy. Academic departments efficiency via DEA |
557 | -- | 572 | Oded Herman, Zvi Ganz. The capacity expansion problem in the service industry |
573 | -- | 586 | Katherine J. Toussaint, Bruce L. Golden. Exchange heuristics to improve the clarity of base/time plots |
587 | -- | 596 | Joaquim Júdice, Fernanda M. Pires. A block principal pivoting algorithm for large-scale strictly monotone linear complementarity problems |