771 | -- | 778 | B. K. Mohanty, T. A. S. Vijayaraghavan. A multi-objective programming problem and its equivalent goal programming problem with appropriate priorities and aspiration levels: A fuzzy approach |
779 | -- | 791 | Yi-Cheng Su, M. Jeya Chandra. An approximation analysis for multistage production lines |
793 | -- | 806 | Christopher Rose, Roy D. Yates. Scheduling arrivals to queues for minimum average blocking: The S(n)/M/C/C system |
807 | -- | 818 | Radhika Santhanam, Jerzy Kyparisis. A multiple criteria decision model for information system project selection |
819 | -- | 828 | Wen Lea Pearn, T. C. Wu. Algorithms for the rural postman problem |
829 | -- | 840 | Huan Li, Yixin Zhu, Ping Yang. Computational analysis of ::::M::::(::::n::::)/::::G::::/1/::::N:::: queues with setup time |
841 | -- | 856 | B. Awadh, N. Sepehri, O. Hawaleshka. A computer-aided process planning model based on genetic algorithms |
857 | -- | 869 | Chae-Young Lee, Jae Young Choi. A genetic algorithm for job sequencing problems with distinct due dates and general early-tardy penalty weights |