Journal: Computers & OR

Volume 23, Issue 3

207 -- 220Mark A. Coffin, Bernard W. Taylor III. Multiple criteria R&D project selection and scheduling using fuzzy logic
221 -- 227Hiroaki Sandoh, Hiroyuki Hirakoshi, Hajime Kawai. An optimal time to sleep for an auto-sleep system
229 -- 235Jacques Renaud, Gilbert Laporte, Fayez F. Boctor. A tabu search heuristic for the multi-depot vehicle routing problem
237 -- 253Ming-Long Liu, Nikolaos V. Sahinidis. Long range planning in the process industries: A projection approach
255 -- 262Wlodzimierz Szwarc. The weighted common due date single machine scheduling problem revisited
263 -- 273Cliff T. Ragsdale, Patrick G. McKeown. On solving the continuous data editing problem
275 -- 288Gary M. Thompson. A simulated-annealing heuristic for shift scheduling using non-continuously available employees
289 -- 297Jong Soo Kim, Kyu Chul Shin, Hyung-Keun Yu. Optimal algorithm to determine the spare inventory level for a repairable-item inventory system
299 -- 308Ho Woo Lee, Seung Hyun Yoon, Soon Seok Lee. A continuous approximation for batch arrival queues with threshold
309 -- 0Patricio A. Rojas. A note about the Abou-El-Ata model