Journal: Computers & OR

Volume 24, Issue 11

991 -- 1003Kwun Ik Cho, Soung Hie Kim. An improved interactive hybrid method for the linear multi-objective knapsack problem
1005 -- 1016Siddhartha S. Syam. A model for the capacitated ::::p::::-facility location problem in global environments
1017 -- 1023Ping Ji, W. B. Lee, HongYu Li. A new algorithm for the assignment problem: An alternative to the Hungarian method
1025 -- 1031Jatinder N. D. Gupta, Vitaly A. Strusevich, C. M. Zwaneveld. Two-stage no-wait scheduling models with setup and removal times separated
1033 -- 1041Alok Aurovillian, Hong Zhang, Malgorzata M. Wiecek. A bookkeeping strategy for multiple objective linear programs
1043 -- 1055Meltem Denizel, S. Selçuk Erengüç. Exact solution procedures for certain planning problems in flexible manufacturing systems
1057 -- 1061Gilbert Laporte. Modeling and solving several classes of arc routing problems as traveling salesman problems
1063 -- 1073Paul A. Savory, Gerald T. Mackulak. An aggregation procedure for simulating manufacturing flow line models
1075 -- 1083Moncer Hariga, Ali Al-Alyan. A lot sizing heuristic for deteriorating items with shortages in growing and declining markets
1085 -- 1095Sungyeol Kang, Richard F. Serfozo. Maxima of sojourn times in acyclic Jackson queueing networks
1097 -- 1100Nenad Mladenovic, Pierre Hansen. Variable neighborhood search