Journal: Computers & OR

Volume 24, Issue 12

1101 -- 1112Soung Hie Kim, Byeong-Seok Ahn. Group decision making procedure considering preference strength under incomplete information
1113 -- 1118Sun Hur. A note on varying the number of states in the arrival process of MR/GI/1 queue
1119 -- 1128D. K. Manna, V. Rajendra Prasad. Pseudopolynomial algorithms for CTV minimization in single machine scheduling
1129 -- 1140Charles M. Macal, Arthur P. Hurter. Dependence of bilevel mathematical programs on irrelevant constraints
1141 -- 1149Parag C. Pendharkar. A fuzzy linear programming model for production planning in coal mines
1151 -- 1168Erik W. Dravnieks, John W. Chinneck. Formulation assistance for global optimization problems
1169 -- 1174Ceyda Oguz, Bertrand M. T. Lin, T. C. Edwin Cheng. Two-stage flowshop scheduling with a common second-stage machine
1175 -- 1186Manuel Laguna, Rafael Martí, Vicente Valls. Arc crossing minimization in hierarchical digraphs with tabu search
1187 -- 1200Linet Özdamar, Hakan Dündar. A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows