1049 | -- | 1074 | Hanif D. Sherali, Burak Özdaryal, Warren P. Adams, Naguib Attia. On using exterior penalty approaches for solving linear programming problems |
1075 | -- | 1092 | Jacques A. Ferland, Soumia Ichoua, Alain Lavoie, Éric Gagné. Scheduling using tabu search methods with intensification and diversification |
1093 | -- | 1110 | Chih-Hsiung Wang, Shey-Huei Sheu. Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorating production system |
1111 | -- | 1130 | Jason Chao-Hsien Pan, Jen-Shiang Chen, Hung-Liang Cheng. A heuristic approach for single-machine scheduling with due dates and class setups |
1131 | -- | 1139 | . Shortest paths in a lattice network: a comparative study |
1141 | -- | 1147 | K. F. Lam, H. W. Mui, H. K. Yuen. A note on minimizing absolute percentage error in combined forecasts |