Journal: Computers & OR

Volume 28, Issue 7

613 -- 624Bertrand M. T. Lin, T. C. Edwin Cheng. Batch scheduling in the no-wait two-machine flowshop to minimize the makespan
625 -- 635Min-Sheng Lin, Ming-Sang Chang, Deng-Jyi Chen, Kuo-Lung Ku. The distributed program reliability analysis on ring-type topologies
637 -- 647Sheng-Pen Wang. Shape-preserving computation in economic growth models
649 -- 669Sakib A. Mondal, Anup K. Sen. Single machine weighted earliness-tardiness penalty problem with a common due date
671 -- 688Herbert Dawid, Johannes König, Christine Strauss. An enhanced rostering model for airline crews
689 -- 704Christos Koulamas, George J. Kyparisis. The three-stage assembly flowshop scheduling problem
705 -- 717Jatinder N. D. Gupta, Johnny C. Ho. Minimizing makespan subject to minimum flowtime on two identical parallel machines