1259 | -- | 1268 | Surabhi Sinha. Fuzzy mathematical programming applied to multi-level programming problems |
1269 | -- | 1287 | Roberto Wolfler Calvo, Roberto Cordone. A heuristic approach to the overnight security service problem |
1289 | -- | 1309 | Bong Dae Choi, Bara Kim, Sung Ho Choi. An ::::M::::/::::G::::/1 queue with multiple types of feedback, gated vacations and FCFS policy |
1311 | -- | 1317 | Kun-Jen Chung. An algorithm for an inventory model with inventory-level-dependent demand rate |
1319 | -- | 1333 | Fang-Chuan Lee, Ming-Jong Yao. A global optimum search algorithm for the joint replenishment problem under power-of-two policy |
1335 | -- | 1347 | C. J. Liao, W. J. Chen. Single-machine scheduling with periodic maintenance and nonresumable jobs |
1349 | -- | 1366 | Bülent Çatay, S. Selçuk Erengüç, Asoo J. Vakharia. Tool capacity planning in semiconductor manufacturing |
1367 | -- | 1381 | Nikolaos F. Giannelos, Michael C. Georgiadis. Efficient scheduling of consumer goods manufacturing processes in the continuous time domain |
1383 | -- | 1399 | Konstantinos Paparrizos, Nikolaos Samaras, George Stephanides. A new efficient primal dual simplex algorithm |
1401 | -- | 1417 | Bong-Ryong Jung, Byung-Geun Sun, Jong Soo Kim, Sun-Eung Ahn. Modeling lateral transshipments in multiechelon repairable-item inventory systems with finite repair channels |