Journal: Computers & OR

Volume 34, Issue 8

2215 -- 2222T. C. Edwin Cheng, Liying Kang, C. T. Ng. An improved algorithm for the p-center problem on interval graphs with unit lengths
2223 -- 2250Jacques Carlier, François Clautiaux, Aziz Moukrim. New reduction procedures and lower bounds for the two-dimensional bin packing problem with fixed orientation
2251 -- 2265Anne Mercier, François Soumis. An integrated aircraft routing, crew scheduling and flight retiming model
2266 -- 2278Gwo-Ji Sheen, Lu-Wen Liao. Scheduling machine-dependent jobs to minimize lateness on machines with identical speed under availability constraints
2279 -- 2292Jeffrey Schaller. A comparison of lower bounds for the single-machine early/tardy problem
2293 -- 2309Andreas Witt, Stefan Voß. Simple heuristics for scheduling with limited intermediate storage
2310 -- 2331Güvenç Sahin, Haldun Süral. A review of hierarchical facility location models
2332 -- 2344Frederico R. B. Cruz, James MacGregor Smith. Approximate analysis of M/G/c/c state-dependent queueing networks
2345 -- 2358Jon Lee. In situ column generation for a cutting-stock problem
2359 -- 2369Alan P. French, John M. Wilson. An LP-based heuristic procedure for the generalized assignment problem with special ordered sets
2370 -- 2383Jorge Riera-Ledesma, Juan José Salazar González. A heuristic approach for the continuous error localization problem in data cleaning
2384 -- 2395Michel Gamache, Alain Hertz, Jérôme Olivier Ouellet. A graph coloring model for a feasibility problem in monthly crew scheduling with preferential bidding
2396 -- 2402Min Ji, Yong He, T. C. Edwin Cheng. A simple linear time algorithm for scheduling with step-improving processing times
2403 -- 2435David Pisinger, Stefan Ropke. A general heuristic for vehicle routing problems
2436 -- 2449Tolga Bektas, Osman Oguz, Iradj Ouveysi. Designing cost-effective content distribution networks
2450 -- 2462Julien Lemesre, Clarisse Dhaenens, El-Ghazali Talbi. Parallel partitioning method (PPM): A new exact method to solve bi-objective problems
2463 -- 2477Hakan Gultekin, M. Selim Akturk, Oya Ekin Karasan. Scheduling in a three-machine robotic flexible manufacturing cell
2478 -- 2494Atsuhiro Dodo, Rachel A. Davidson, Ningxiong Xu, Linda K. Nozick. Application of regional earthquake mitigation optimization
2495 -- 2519Pedro Martins. Enhanced second order algorithm applied to the capacitated minimum spanning tree problem
2520 -- 2531Tommy Thomadsen, Jesper Larsen. A hub location problem with fully interconnected backbone and access networks