Journal: Computers & OR

Volume 35, Issue 10

3049 -- 3051Walter J. Gutjahr, Mark Harman. Search-based software engineering
3052 -- 3072Eugenia Díaz, Javier Tuya, Raquel Blanco, José Javier Dolado. A tabu search algorithm for structural software testing
3073 -- 3089Ahilton Barreto, Márcio de Oliveira Barros, Cláudia Maria Lima Werner. Staffing a software project: A constraint satisfaction and optimization-based approach
3090 -- 3106Vittorio Cortellessa, Fabrizio Marinelli, Pasqualina Potena. An optimization framework for build-or-buy decisions in software architecture
3107 -- 3124Moataz A. Ahmed, Irman Hermadi. GA-based multiple paths test data generator
3125 -- 3143Concettina Del Grosso, Giuliano Antoniol, Ettore Merlo, Philippe Galinier. Detecting buffer overflow via automatic test input data generation
3144 -- 3160Oliver Bühler, Joachim Wegener. Evolutionary functional testing
3161 -- 3183Enrique Alba, J. Francisco Chicano. Observations in using parallel and sequential evolutionary algorithms for automatic software testing
3184 -- 3201Joseph El Hayek, Aziz Moukrim, Stéphane Nègre. New resolution algorithm and pretreatments for the two-dimensional bin-packing problem
3202 -- 3212F. Pezzella, G. Morganti, G. Ciaschetti. A genetic algorithm for the Flexible Job-shop Scheduling Problem
3213 -- 3229Johan Oppen, Arne Løkketangen. A tabu search approach for the livestock collection problem
3230 -- 3242Ming-Jong Yao, Weng-Ming Chu, Yen-Fei Lin. Determination of replenishment dates for restricted-storage, static demand, cyclic replenishment schedule
3243 -- 3261D. Y. Sha, Cheng-Yu Hsu. A new particle swarm optimization for the open shop scheduling problem
3262 -- 3275Han-Yu Gu. Computation of approximate alpha-points for large scale single machine scheduling problem
3276 -- 3283Ching-Fang Liaw. An efficient simple metaheuristic for minimizing the makespan in two-machine no-wait job shops
3284 -- 3297Ningxiong Xu, Sally A. McKee, Linda K. Nozick, Ruke Ufomata. Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem
3298 -- 3310Victor J. Rayward-Smith, D. Rebaine. Analysis of heuristics for the UET two-machine flow shop problem with time delays
3311 -- 3330M. Elena Sáiz, Eligius M. T. Hendrix. Methods for computing Nash equilibria of a location-quantity game
3331 -- 3346Eduardo Rodriguez-Tello, Jin-Kao Hao, Jose Torres-Jimenez. An effective two-stage simulated annealing algorithm for the minimum linear arrangement problem
3347 -- 3359Alan R. McKendall Jr.. Improved Tabu search heuristics for the dynamic space allocation problem
3360 -- 3370Patrizia Beraldi, Domenico Conforti, Antonio Violi. A two-stage stochastic programming model for electric energy producers
3371 -- 3392Sigrid Lise Nonås, Anders Thorstenson. Solving a combined cutting-stock and lot-sizing problem with a column generating procedure