Journal: Computers & OR

Volume 35, Issue 9

2709 -- 2710Karl F. Doerner, Richard F. Hartl. Editorial
2711 -- 2727Walter J. Gutjahr. First steps to the runtime complexity analysis of ant colony optimization
2728 -- 2749James Montgomery, Marcus Randall, Tim Hendtlass. Solution bias in ant colony optimisation: Lessons for selecting pheromone models
2750 -- 2759Frank Neumann. Expected runtimes of evolutionary algorithms for the Eulerian cycle problem
2760 -- 2775A. I. Ölçer. A hybrid approach for multi-objective combinatorial optimisation problems in ship design and shipping
2776 -- 2790Antonio J. Nebro, Gabriel Luque, Francisco Luna, Enrique Alba. DNA fragment assembly using a grid-based genetic algorithm
2791 -- 2806Bo Liu, Ling Wang, Yihui Jin. An effective hybrid PSO-based algorithm for flow shop scheduling with limited buffers
2807 -- 2839Quan-Qe Pan, Mehmet Fatih Tasgetiren, Yun-Chia Liang. A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem
2840 -- 2860Pablo Cortés, José M. García, Jesús Muñuzuri, Luis Onieva. Viral systems: A new bio-inspired optimisation approach
2861 -- 2876A. Dasci, M. Karakul. Performance evaluation of a single-stage two-product manufacturing system operating under pull-type control
2877 -- 2891Tsung-Sheng Chang. Best routes selection in international intermodal networks
2892 -- 2907Jie Gao, Linyan Sun, Mitsuo Gen. A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems
2908 -- 2924Irina Gribkovskaia Sr., Gilbert Laporte, Aliaksandr Shyshou. The single vehicle routing problem with deliveries and selective pickups
2925 -- 2936Alvaro Gomes, Carlos Henggeler Antunes, Antonio Gomes Martins. Design of an adaptive mutation operator in an electrical load management case study
2937 -- 2951Mesut Yavuz, Umut H. Inan, Alpaslan Figlali. Fair referee assignments for professional football leagues
2952 -- 2963Ling-Huey Su, Yuan-Yu Lee. The two-machine flowshop no-wait scheduling problem with a single server to minimize the total completion time
2964 -- 2987Stanislav Busygin, Oleg A. Prokopyev, Panos M. Pardalos. Biclustering in data mining
2988 -- 3000Peter Schütz, Leen Stougie, Asgeir Tomasgard. Stochastic facility location with general long-run costs and convex short-run costs
3001 -- 3008Pawel Jan Kalczynski, Jerzy Kamburowski. An improved NEH heuristic to minimize makespan in permutation flow shops
3009 -- 3019Hande Yaman. Star p-hub median problem with modular arc capacities
3020 -- 3033Joaquín Bautista, Elena Fernández, Jordi Pereira. Solving an urban waste collection problem using ants heuristics
3034 -- 3048Karl F. Doerner, Manfred Gronalt, Richard F. Hartl, Guenter Kiechle, Marc Reimann. Exact and heuristic algorithms for the vehicle routing problem with multiple interdependent time windows