| 299 | -- | 300 | Gerd Finke, Vitaly A. Strusevich, Frank Werner. Guest Editorial |
| 301 | -- | 307 | Nadia Brauner, Gerd Finke, Vassilissa Lehoux-Lebacque, Chris Potts, Jonathan Whitehead. Scheduling of coupled tasks and one-machine no-wait robotic cells |
| 308 | -- | 315 | T. C. Edwin Cheng, A. A. Lazarev, E. R. Gafarov. A hybrid algorithm for the single-machine total tardiness problem |
| 316 | -- | 324 | M. V. Devyaterikova, A. A. Kolokolov, A. P. Kolosov. L-class enumeration algorithms for a discrete production planning problem with interval resource quantities |
| 325 | -- | 328 | Valery Gordon, Alexander Tarasevich. A note: Common due date assignment for a single machine scheduling with the rate-modifying activity |
| 329 | -- | 343 | Hakan Gultekin, Oya Ekin Karasan, M. Selim Akturk. Pure cycles in flexible robotic cells |
| 344 | -- | 357 | Olga Guschinskaya, Alexandre Dolgui, Nikolai Guschinsky, Genrikh Levin. Minimizing makespan for multi-spindle head machines with a mobile table |
| 358 | -- | 378 | Jitti Jungwattanakit, Manop Reodecha, Paveena Chaovalitwongse, Frank Werner. A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria |
| 379 | -- | 390 | Mikhail A. Kubzin, Chris N. Potts, Vitaly A. Strusevich. Approximation results for flow shop scheduling problems with machine availability constraints |
| 391 | -- | 401 | A. Oulamara, G. Finke, A. Kamgaing Kuiteing. Flowshop scheduling problem with a batching machine and task compatibilities |
| 402 | -- | 414 | Reza Tavakkoli-Moghaddam, Nima Safaei, Farrokh Sassani. A memetic algorithm for the flexible flow line scheduling problem with processor blocking |
| 415 | -- | 424 | Taofeng Ye. Queueing network analysis on dynamic lot streaming |
| 425 | -- | 432 | Wenqi Huang, Kun He. A new heuristic algorithm for cuboids packing with no orientation constraints |
| 433 | -- | 441 | Sebastian Sitarz. Ant algorithms and simulated annealing for multicriteria dynamic programming |
| 442 | -- | 460 | Daniela Ambrosino, Anna Sciomachen, Maria Grazia Scutellà. A heuristic based on multi-exchange techniques for a regional fleet assignment location-routing problem |
| 461 | -- | 471 | Ling-Huey Su. Minimizing earliness and tardiness subject to total completion time in an identical parallel machine system |
| 472 | -- | 486 | Jaehwan Yang. Two machine flow shop scheduling problem with weighted WIP costs |
| 487 | -- | 498 | Manuel Laguna, Abraham Duarte, Rafael Martí. Hybridizing the cross-entropy method: An application to the max-cut problem |
| 499 | -- | 529 | Daniel De Ladurantaye, Michel Gendreau, Jean-Yves Potvin. Optimizing profits from hydroelectricity production |
| 530 | -- | 548 | M. Caserta, E. Quiñonez Rico. A cross entropy-Lagrangean hybrid algorithm for the multi-item capacitated lot-sizing problem with setup times |
| 549 | -- | 564 | Sebastián Lozano, Gabriel Villa. Multiobjective target setting in data envelopment analysis using AHP |
| 565 | -- | 583 | Wen-Hua Yang. Scheduling jobs on a single machine to maximize the total revenue of jobs |
| 584 | -- | 596 | Kevin R. Hutson, Douglas R. Shier. Extended dominance and a stochastic shortest path problem |
| 597 | -- | 611 | Maria Albareda-Sambola, Elena Fernández, Gilbert Laporte. The capacity and distance constrained plant location problem |
| 612 | -- | 622 | Yaodong Cui, Yiping Lu. Heuristic algorithm for a cutting stock problem in the steel bridge construction |
| 623 | -- | 636 | Brandon Y. H. Wong, Mariano Luque, Jian-Bo Yang. Using interactive multiobjective methods to solve DEA problems with value judgements |