Journal: Computers & OR

Volume 36, Issue 8

2329 -- 0Gilles Pesant, Meinolf Sellmann, Bernard Gendron. Special issue on constraint programming
2330 -- 2340Christian Artigues, Michel Gendreau, Louis-Martin Rousseau, Adrien Vergnaud. Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound
2341 -- 2347Meinolf Sellmann. Approximated consistency for the automatic recording constraint
2348 -- 2356Christine Wei Wu, Kenneth N. Brown, J. Christopher Beck. Scheduling with uncertain durations: Modeling beta-robust scheduling with constraints
2357 -- 2375Laurent D. Michel, Andrew See, Pascal Van Hentenryck. Parallel and distributed local search in COMET
2376 -- 2386Alda Carvalho, Nuno Crato, Carla P. Gomes. A generative power-law search tree model
2387 -- 2393Mourad Boudhar, Amina Haned. Preemptive scheduling in the presence of transportation times
2394 -- 2417M. Duran Toksari, Ertan Güner. Parallel machine earliness/tardiness scheduling problem under the effects of position based learning and linear/nonlinear deterioration
2418 -- 2428M. Pilar Cristobal, Laureano F. Escudero, Juan F. Monge. On stochastic dynamic programming for solving large-scale planning problems under uncertainty
2429 -- 2433Federico Della Croce, Andrea Grosso, Marco Locatelli. A heuristic approach for the max-min diversity problem based on max-clique
2434 -- 2439Suvrajeet Sen, Zhihong Zhou, Kai Huang. Enhancements of two-stage stochastic decomposition
2440 -- 2449Antonio Mauttone, María E. Urquhart. A route set construction algorithm for the transit network design problem
2450 -- 2461Arezoo Atighehchian, Mehdi Bijari, Hamed Tarkesh. A novel hybrid algorithm for scheduling steel-making continuous casting production
2462 -- 2471Hojung Shin, W. C. Benton, Minjoon Jun. Quantifying suppliers product quality and delivery performance: A sourcing policy decision model
2472 -- 2483Adebayo Alabi, Jordi Castro. Dantzig-Wolfe and block coordinate-descent decomposition in large-scale integrated refinery-planning
2484 -- 2489Mohsen S. Sajadieh, Mohammad R. Akbari Jokar, Mohammad Modarres. Developing a coordinated vendor-buyer model in two-stage supply chains with stochastic lead-times
2490 -- 2497Huei-Chuen Huang, Loo Hay Lee, Haiqing Song, Brian Thomas Eck. SimMan - A simulation model for workforce capacity planning
2498 -- 2511Quan-ke Pan, Ling Wang, Bin Qian. A novel differential evolution algorithm for bi-criteria no-wait flow shop scheduling problems