Journal: Computers & OR

Volume 37, Issue 5

807 -- 808Jens Clausen, Allan Larsen, Jesper Larsen. Foreword
809 -- 821Jens Clausen, Allan Larsen, Jesper Larsen, Natalia J. Rezanova. Disruption management in the airline industry - Concepts, models and methods
822 -- 832Edmund K. Burke, Patrick De Causmaecker, Geert De Maere, Jeroen Mulder, Marc Paelinck, Greet Vanden Berghe. A multi-objective approach for robust airline scheduling
833 -- 844Oliver Weide, David Ryan, Matthias Ehrgott. An iterative approach to robust and integrated aircraft routing and crew scheduling
845 -- 856Natalia J. Rezanova, David M. Ryan. The train driver recovery problem - A set partitioning based model and solution method
857 -- 868Christian Liebchen, Michael Schachtebeck, Anita Schöbel, Sebastian Stiller, André Prigge. Computing delay resistant railway timetables
869 -- 879Satish V. Ukkusuri, Gitakrishnan Ramadurai, Gopal Patil. A robust transportation signal control problem accounting for traffic dynamics
880 -- 889El Houssaine Aghezzaf, Carles Sitompul, Najib M. Najid. Models for robust tactical planning in multi-stage production systems with uncertain demands
890 -- 898Mohamed Ali Aloulou, Christian Artigues. Flexible solutions in disjunctive scheduling: General formulation and study of the flow-shop case
899 -- 908Singa Wang Chiu. Robust planning in optimization for production system subject to random machine breakdown and failure in rework
909 -- 915A. Volgenant, C. W. Duin. Improved polynomial algorithms for robust bottleneck problems with interval data
916 -- 926Cameron G. Walker, Michael J. O Sullivan. Core-Edge design of storage area networks - A Single-edge formulation with problem-specific cuts
927 -- 937Jinwei Gu, Manzhan Gu, Cuiwen Cao, Xingsheng Gu. A novel competitive co-evolutionary quantum genetic algorithm for stochastic job shop scheduling problem
938 -- 949Mateus Rocha de Paula, Geraldo Robson Mateus, Martín Gómez Ravetti. A non-delayed relax-and-cut algorithm for scheduling problems with parallel machines, due dates and sequence-dependent setup times
950 -- 959Ran Liu, Zhibin Jiang, Richard Y. K. Fung, Feng Chen, Xiao Liu. Two-phase heuristic algorithms for full truckloads multi-depot capacitated vehicle routing problem in carrier collaboration
960 -- 969Hua Gong, Lixin Tang, C. W. Duin. A two-stage flow shop scheduling problem on a batching machine and a discrete machine with blocking and shared setup times
970 -- 980Jean-François Cordeau, Mauro Dell Amico, Manuel Iori. Branch-and-cut for the pickup and delivery traveling salesman problem with FIFO loading
981 -- 990Kaj Holmberg. Heuristics for the rural postman problem