807 | -- | 808 | Jens Clausen, Allan Larsen, Jesper Larsen. Foreword |
809 | -- | 821 | Jens Clausen, Allan Larsen, Jesper Larsen, Natalia J. Rezanova. Disruption management in the airline industry - Concepts, models and methods |
822 | -- | 832 | Edmund K. Burke, Patrick De Causmaecker, Geert De Maere, Jeroen Mulder, Marc Paelinck, Greet Vanden Berghe. A multi-objective approach for robust airline scheduling |
833 | -- | 844 | Oliver Weide, David Ryan, Matthias Ehrgott. An iterative approach to robust and integrated aircraft routing and crew scheduling |
845 | -- | 856 | Natalia J. Rezanova, David M. Ryan. The train driver recovery problem - A set partitioning based model and solution method |
857 | -- | 868 | Christian Liebchen, Michael Schachtebeck, Anita Schöbel, Sebastian Stiller, André Prigge. Computing delay resistant railway timetables |
869 | -- | 879 | Satish V. Ukkusuri, Gitakrishnan Ramadurai, Gopal Patil. A robust transportation signal control problem accounting for traffic dynamics |
880 | -- | 889 | El Houssaine Aghezzaf, Carles Sitompul, Najib M. Najid. Models for robust tactical planning in multi-stage production systems with uncertain demands |
890 | -- | 898 | Mohamed Ali Aloulou, Christian Artigues. Flexible solutions in disjunctive scheduling: General formulation and study of the flow-shop case |
899 | -- | 908 | Singa Wang Chiu. Robust planning in optimization for production system subject to random machine breakdown and failure in rework |
909 | -- | 915 | A. Volgenant, C. W. Duin. Improved polynomial algorithms for robust bottleneck problems with interval data |
916 | -- | 926 | Cameron G. Walker, Michael J. O Sullivan. Core-Edge design of storage area networks - A Single-edge formulation with problem-specific cuts |
927 | -- | 937 | Jinwei Gu, Manzhan Gu, Cuiwen Cao, Xingsheng Gu. A novel competitive co-evolutionary quantum genetic algorithm for stochastic job shop scheduling problem |
938 | -- | 949 | Mateus Rocha de Paula, Geraldo Robson Mateus, Martín Gómez Ravetti. A non-delayed relax-and-cut algorithm for scheduling problems with parallel machines, due dates and sequence-dependent setup times |
950 | -- | 959 | Ran Liu, Zhibin Jiang, Richard Y. K. Fung, Feng Chen, Xiao Liu. Two-phase heuristic algorithms for full truckloads multi-depot capacitated vehicle routing problem in carrier collaboration |
960 | -- | 969 | Hua Gong, Lixin Tang, C. W. Duin. A two-stage flow shop scheduling problem on a batching machine and a discrete machine with blocking and shared setup times |
970 | -- | 980 | Jean-François Cordeau, Mauro Dell Amico, Manuel Iori. Branch-and-cut for the pickup and delivery traveling salesman problem with FIFO loading |
981 | -- | 990 | Kaj Holmberg. Heuristics for the rural postman problem |