1515 | -- | 1536 | Henrik Andersson, Arild Hoff, Marielle Christiansen, Geir Hasle, Arne Løkketangen. Industrial aspects and literature survey: Combined inventory management and routing |
1537 | -- | 1543 | Zhixin Liu. Single machine scheduling to minimize maximum lateness subject to release dates and precedence constraints |
1544 | -- | 1556 | Daniel T. Wojtaszek, John W. Chinneck. Faster MIP solutions via new node selection rules |
1557 | -- | 1569 | Francesca Guerriero, L. Talarico. A solution approach to find the critical path in a time-constrained activity network |
1570 | -- | 1583 | Manuel López-Ibáñez, Christian Blum. Beam-ACO for the travelling salesman problem with time windows |
1584 | -- | 1596 | A. Berrichi, Farouk Yalaoui, Lionel Amodeo, M. Mezghiche. Bi-Objective Ant Colony Optimization approach to optimize production and maintenance scheduling |
1597 | -- | 1609 | Fernando García, Francisco Guijarro, Ismael Moya. A goal programming approach to estimating performance weights for ranking firms |
1610 | -- | 1614 | Ismael Regis de Farias Jr., Hongxia Zhao, Ming Zhao. A family of inequalities valid for the robust single machine scheduling polyhedron |
1615 | -- | 1623 | Min Wen, Jean-François Cordeau, Gilbert Laporte, Jesper Larsen. The dynamic multi-period vehicle routing problem |
1624 | -- | 1640 | Xianpeng Wang, Lixin Tang. A hybrid metaheuristic for the prize-collecting single machine scheduling problem with sequence-dependent setup times |
1641 | -- | 1647 | Andreas Bley, Natashia Boland, Christopher Fricke, Gary Froyland. A strengthened formulation and cutting planes for the open pit mine production scheduling problem |
1648 | -- | 1661 | Burcu B. Keskin, Sharif H. Melouk, Ivan L. Meyer. A simulation-optimization approach for integrated sourcing and inventory decisions |
1662 | -- | 1673 | Luc Muyldermans, Gu Pang. A guided local search procedure for the multi-compartment capacitated arc routing problem |