Journal: Computers & OR

Volume 37, Issue 9

1515 -- 1536Henrik Andersson, Arild Hoff, Marielle Christiansen, Geir Hasle, Arne Løkketangen. Industrial aspects and literature survey: Combined inventory management and routing
1537 -- 1543Zhixin Liu. Single machine scheduling to minimize maximum lateness subject to release dates and precedence constraints
1544 -- 1556Daniel T. Wojtaszek, John W. Chinneck. Faster MIP solutions via new node selection rules
1557 -- 1569Francesca Guerriero, L. Talarico. A solution approach to find the critical path in a time-constrained activity network
1570 -- 1583Manuel López-Ibáñez, Christian Blum. Beam-ACO for the travelling salesman problem with time windows
1584 -- 1596A. Berrichi, Farouk Yalaoui, Lionel Amodeo, M. Mezghiche. Bi-Objective Ant Colony Optimization approach to optimize production and maintenance scheduling
1597 -- 1609Fernando García, Francisco Guijarro, Ismael Moya. A goal programming approach to estimating performance weights for ranking firms
1610 -- 1614Ismael Regis de Farias Jr., Hongxia Zhao, Ming Zhao. A family of inequalities valid for the robust single machine scheduling polyhedron
1615 -- 1623Min Wen, Jean-François Cordeau, Gilbert Laporte, Jesper Larsen. The dynamic multi-period vehicle routing problem
1624 -- 1640Xianpeng Wang, Lixin Tang. A hybrid metaheuristic for the prize-collecting single machine scheduling problem with sequence-dependent setup times
1641 -- 1647Andreas Bley, Natashia Boland, Christopher Fricke, Gary Froyland. A strengthened formulation and cutting planes for the open pit mine production scheduling problem
1648 -- 1661Burcu B. Keskin, Sharif H. Melouk, Ivan L. Meyer. A simulation-optimization approach for integrated sourcing and inventory decisions
1662 -- 1673Luc Muyldermans, Gu Pang. A guided local search procedure for the multi-compartment capacitated arc routing problem