| 1661 | -- | 1670 | Dennis Weyland, Roberto Montemanni, Luca Maria Gambardella. Heuristics for the probabilistic traveling salesman problem with deadlines based on quasi-parallel Monte Carlo sampling |
| 1671 | -- | 1679 | Kagan Gokbayrak, E. Alper Yildirim. Joint gateway selection, transmission slot assignment, routing and power control for wireless mesh networks |
| 1680 | -- | 1692 | Li Tao, Liyuan Zhang, Xuanhua Xu, Shan Gao. The GI/Geo/1 queue with Bernoulli-schedule-controlled vacation and vacation interruption |
| 1693 | -- | 1699 | Mohamed Haouari, Mohamed Kharbeche. An assignment-based lower bound for a class of two-machine flow shop problems |
| 1700 | -- | 1707 | Thijs Dewilde, Dirk Cattrysse, Sofie Coene, Frits C. R. Spieksma, Pieter Vansteenwegen. Heuristics for the traveling repairman problem with profits |
| 1708 | -- | 1715 | M. Angélica Salazar-Aguilar, André Langevin, Gilbert Laporte. The synchronized arc and node routing problem: Application to road marking |
| 1716 | -- | 1728 | Marco Castro, Kenneth Sörensen, Pieter Vansteenwegen, Peter Goos. A memetic algorithm for the travelling salesperson problem with hotel selection |
| 1729 | -- | 1743 | Mehmet Fatih Tasgetiren, Quan-ke Pan, Ponnuthurai N. Suganthan, Ozge Buyukdagli. A variable iterated greedy algorithm with differential evolution for the no-idle permutation flowshop scheduling problem |
| 1744 | -- | 1751 | Rasool Tahmasbi, Ebrahim Nasrabadi, S. Mehdi Hashemi. The value of information in stochastic maximum flow problems |
| 1752 | -- | 1757 | Xuewen Mu, Yaling Zhang. An alternating direction method for second-order conic programming |
| 1758 | -- | 1765 | Jian Zhang, Wensheng Yang, Yiliu Tu. Scheduling with compressible and stochastic release dates |
| 1766 | -- | 1776 | Mohamed Barkaoui, Michel Gendreau. An adaptive evolutionary approach for real-time vehicle routing and dispatching |
| 1777 | -- | 1789 | Kumar Satyam, Ananth Krishnamurthy, Manjunath Kamath. Solving general multi-class closed queuing networks using parametric decomposition |
| 1790 | -- | 1803 | Sergey Dudin, Che Soong Kim, Olga Dudina. MMAP|M|N queueing system with impatient heterogeneous customers as a model of a contact center |
| 1804 | -- | 1818 | Gonçalo Figueira, Maristela Oliveira Santos, Bernardo Almada-Lobo. A hybrid VNS approach for the short-term production planning and scheduling: A case study in the pulp and paper industry |
| 1819 | -- | 1828 | Mariona Vilà, Jordi Pereira. Exact and heuristic procedures for single machine scheduling with quadratic earliness and tardiness penalties |
| 1829 | -- | 1841 | Francisco J. Rodríguez, Manuel Lozano, Christian Blum, Carlos García-Martínez. An iterated greedy algorithm for the large-scale unrelated parallel machines scheduling problem |
| 1842 | -- | 1851 | Barry R. Cobb, Rafael Rumí, Antonio Salmerón. Inventory management with log-normal demand per unit time |
| 1852 | -- | 1863 | Tao Wu, Canrong Zhang, Zhe Liang, Stephen C. H. Leung. A Lagrangian relaxation-based method and models evaluation for multi-level lot sizing problems with backorders |
| 1864 | -- | 1873 | Christian Metzger, Frédéric Thiesse, Stanley B. Gershwin, Elgar Fleisch. The impact of false-negative reads on the performance of RFID-based shelf inventory control policies |
| 1874 | -- | 1883 | Ghasem Moslehi, Danial Khorasanian. Optimizing blocking flow shop scheduling problem with total completion time criterion |
| 1884 | -- | 1894 | Guohua Wu, Jin Liu, Manhao Ma, Dishan Qiu. A two-phase scheduling method with the consideration of task clustering for earth observing satellites |
| 1895 | -- | 1906 | Nathalie Perrier, Bruno Agard, Pierre Baptiste, Jean-Marc Frayret, André Langevin, Robert Pellerin, Diane Riopel, Martin Trépanier. A survey of models and algorithms for emergency response logistics in electric distribution systems. Part I: Reliability planning with fault considerations |
| 1907 | -- | 1922 | Nathalie Perrier, Bruno Agard, Pierre Baptiste, Jean-Marc Frayret, André Langevin, Robert Pellerin, Diane Riopel, Martin Trépanier. A survey of models and algorithms for emergency response logistics in electric distribution systems. Part II: Contingency planning level |