1 | -- | 10 | Anita Schöbel. A Model for the Delay Management Problem based on Mixed-Integer-Programming |
11 | -- | 12 | Frank Wagner. A Complete Model of the Deutsche Bahn - Prosim and Beyond |
13 | -- | 23 | Horst W. Hamacher, Annegret Liebers, Anita Schöbel, Dorothea Wagner, Frank Wagner. Locating New Stops in a Railway Network |
24 | -- | 38 | Joan Boyar, Susan Krarup, Morten N. Nielsen. Seat Reservation Allowing Seat Changes |
39 | -- | 53 | Xavier Delorme, Joaquin Rodriguez, Xavier Gandibleux. Heuristics for railway infrastructure saturation |
54 | -- | 64 | Krzysztof Goczyla. Web-Based Integrated Timetable Information System for Railways and Airlines |
65 | -- | 79 | Deepak Kapur, Victor L. Winter, Raymond Berg. Designing a Controller for a Multi-Train Multi-Track System |
80 | -- | 81 | Christos D. Zaroliagis. Introduction - Algorithmic MeThods and Models for Optimization of RailwayS - ATMOS 2001 |