| 250 | -- | 259 | Taeho Ahn, S. Selçuk Erengüç. The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure |
| 260 | -- | 271 | Lucio Bianco, Paolo Dell'Olmo, Maria Grazia Speranza. Heuristics for multimode scheduling problems with dedicated resources |
| 272 | -- | 288 | Peter Brucker, Sigrid Knust, Arno Schoo, Olaf Thiele. A branch and bound algorithm for the resource-constrained project scheduling problem |
| 289 | -- | 305 | Stéphane Dauzère-Pérès, W. Roux, Jean B. Lasserre. Multi-resource shop scheduling with resource flexibility |
| 306 | -- | 314 | Christelle Guéret, Christian Prins. Classical and new heuristics for the open-shop problem: A computational evaluation |
| 315 | -- | 324 | Maciej Hapke, Andrzej Jaszkiewicz, Roman Slowinski. Interactive analysis of multiple-criteria project scheduling problems |
| 325 | -- | 337 | Adam Janiak. Minimization of the makespan in a two-machine problem under given resource constraints |
| 338 | -- | 353 | Joanna Józefowska, Jan Weglarz. On a methodology for discrete-continuous scheduling |
| 354 | -- | 370 | Joanna Józefowska, Marek Mika, Rafal Rózycki, Grzegorz Waligóra, Jan Weglarz. Local search metaheuristics for discrete-continuous scheduling problems |
| 371 | -- | 377 | Vladimir Kats, Eugene Levner. Minimizing the number of vehicles in periodic scheduling: The non-Euclidean case |
| 378 | -- | 388 | Irene N. Lushchakova, Svetlana A. Kravchenko. Two-machine shop scheduling with zero and unit processing times |
| 389 | -- | 400 | Marie-Claude Portmann, Antony Vignier, D. Dardilhac, D. Dezalay. Branch and bound crossed with GA to solve hybrid flowshops |
| 401 | -- | 413 | Franciszek Seredynski. Distributed scheduling using simple learning machines |
| 414 | -- | 430 | Funda Sivrikaya-Serifoglu, Gündüz Ulusoy. A bicriteria two-machine permutation flowshop problem |
| 431 | -- | 450 | Arno Sprecher, Andreas Drexl. Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm |
| 451 | -- | 469 | L. Valadares Tavares, J. Antunes Ferreira, J. Silva Coelho. On the optimal management of project risk |
| 470 | -- | 491 | Vicente Valls, M. Angeles Pérez Alarcó, Sacramento Quintanilla. Pre-processing techniques for resource allocation in the heterogeneous case |
| 492 | -- | 506 | Victor D. Wiley, Richard F. Deckro, Jack A. Jackson Jr.. Optimization analysis for design and planning of multi-project programs |