Journal: European Journal of Operational Research

Volume 165, Issue 2

285 -- 288Vicente Valls, Jan Weglarz. Project management and scheduling
289 -- 306Willy Herroelen, Roel Leus. Project scheduling under uncertainty: Survey and research potentials
307 -- 313Salah E. Elmaghraby. On the fallacy of averages in project risk management
314 -- 328Christian Artigues, Jean-Charles Billaut, Carl Esswein. Maximization of solution flexibility for robust shop scheduling
329 -- 338Anand Paul, Genaro Gutierrez. Simple probability models for project contracting
339 -- 358Can Akkan, Andreas Drexl, Alf Kimms. Network decomposition-based benchmark results for the discrete time-cost tradeoff problem
359 -- 374Mario Vanhoucke. New computational results for the discrete time/cost trade-off problem with time-switch constraints
375 -- 386Vicente Valls, Francisco Ballestín, Sacramento Quintanilla. Justification and RCPSP: A technique that pays
387 -- 397Sergey V. Sevastianov. An introduction to multi-parameter complexity analysis of discrete problems
398 -- 407Peter Brucker, Sigrid Knust, Guoqing Wang. Complexity results for flow-shop problems with a single server
408 -- 415Jacek Blazewicz, Erwin Pesch, Malgorzata Sterna, Frank Werner. The two-machine flow-shop problem with weighted late work criterion and common due date
416 -- 422Adam Janiak, Mikhail Y. Kovalyov, Wieslaw Kubiak, Frank Werner. Positive half-products and scheduling with controllable processing times
423 -- 443T. C. Edwin Cheng, C. T. Ng, J. J. Yuan, Z. H. Liu. Single machine scheduling to minimize total weighted tardiness
444 -- 456T. C. Edwin Cheng, Natalia V. Shakhlevich. Minimizing non-decreasing separable objective functions for the unit-time open shop scheduling problem
457 -- 467Marco Ghirardi, Chris N. Potts. Makespan minimization for scheduling unrelated parallel machines: A recovering beam search approach
468 -- 478Gaurav Singh. Scheduling UET-UCT outforests to minimize maximum lateness
479 -- 494Rubén Ruiz, Concepción Maroto. A comprehensive review and evaluation of permutation flowshop heuristics
495 -- 509Klaus Neumann, Christoph Schwindt, Norbert Trautmann. Scheduling of continuous and discontinuous material flows with intermediate storage restrictions
510 -- 524Francis Sourd, Jerome Rogerie. Continuous filling and emptying of storage systems in constraint-based scheduling
525 -- 534Ramón Alvarez-Valdés, A. Fuertes, José Manuel Tamarit, G. Giménez, R. Ramos. A heuristic to schedule flexible job-shop in a glass factory
535 -- 553Philippe Lacomme, Christian Prins, Wahiba Ramdane-Chérif. Evolutionary algorithms for periodic arc routing problems