Journal: Fuzzy Sets and Systems

Volume 127, Issue 2

99 -- 116Juite Wang. A fuzzy project scheduling approach to minimize schedule risk for product development
117 -- 129Chengyao Wang, Dingwei Wang, W. H. Ip, D. W. Yuen. The single machine ready time scheduling problem with fuzzy processing times
131 -- 140Dorota Kuchta. A generalisation of an algorithm solving the fuzzy multiple choice knapsack problem
141 -- 164. Multi-objective optimization problems with fuzzy relation equation constraints
165 -- 176Cheng-Liang Chen, Daim-Yuang Sun, Nicholas Chia-Yuan Chang. Numerical solution of dynamic optimization problems with flexible inequality constraints by iterative dynamic programming
177 -- 183Robert Fullér, Margit Kovács, György Schuster. Flexible linear programs with a restricted overall flexibility level
185 -- 197Masatoshi Sakawa, Ichiro Nishizaki. Interactive fuzzy programming for two-level nonconvex programming problems with fuzzy parameters through genetic algorithms
199 -- 208Sun Sup So, Sung Deok Cha, Yong Rae Kwon. Empirical evaluation of a fuzzy logic-based software quality prediction model
209 -- 220M. H. Rasmy, Sang M. Lee, Waiel F. Abd El-Wahed, Ali M. Ragab, M. M. El-Sherbiny. An expert system for multiobjective decision making: application of fuzzy linguistic preferences and goal programming
221 -- 240Hussein Dourra, Pepe Siy. Investment using technical analysis and fuzzy logic
241 -- 246Xiao Luo. A new approach to sum-fuzzy rational choice functions