3305 | -- | 3318 | Albert Corominas. A model for designing a procurement-inventory system as a defence against a recurring epidemic |
3319 | -- | 3338 | Jianyu Long, Panos M. Pardalos, Chuan Li 0003. Level-based multi-objective particle swarm optimizer for integrated production scheduling and vehicle routing decision with inventory holding, delivery, and tardiness costs |
3339 | -- | 3359 | Thomas D. Hedberg, M. E. Sharp, T. M. M. Maw, Moneer Helu, M. M. Rahman, S. Jadhav, J. J. Whicker, A. Barnard Feeney. Defining requirements for integrating information between design, manufacturing, and inspection |
3360 | -- | 3382 | Apostolos P. Elekidis, Michael C. Georgiadis. Production scheduling of flexible continuous make-and-pack processes with byproducts recycling |
3383 | -- | 3396 | Danial Khorasanian, Franklin Dexter, Erik Demeulemeester, Ghasem Moslehi. Minimising the number of cancellations at the time of a severe lack of postanesthesia care unit beds or nurses |
3397 | -- | 3418 | Ke Yan, Guowei Hua, T. C. E. Cheng, Shouyang Wang, Jing-Xin Dong. Joint promotion of cross-market retailers: models and analysis |
3419 | -- | 3434 | Jacques Carlier, Abderrahim Sahli, Antoine Jouglet, Eric Pinson. A faster checker of the energetic reasoning for the cumulative scheduling problem |
3435 | -- | 3460 | Haijuan Cui, Xiaochuan Luo, Yuan Wang. Scheduling of steelmaking-continuous casting process with different processing routes using effective surrogate Lagrangian relaxation approach and improved concave-convex procedure |
3461 | -- | 3475 | Mingzhu Yu, Yan Chen, Zelong Yi, Qi Wang, Zizhen Zhang. Benefits of market information and professional advice in a vertical agricultural supply chain: the role of government provision |
3476 | -- | 3500 | Amina Chelly, Imen Nouira, Atidel B. Hadj-Alouane, Yannick Frein. A comparative study of progressive carbon taxation strategies: impact on firms' economic and environmental performances |
3501 | -- | 3520 | Tom Servranckx, José Coelho, Mario Vanhoucke. Various extensions in resource-constrained project scheduling with alternative subgraphs |
3521 | -- | 3533 | Pedro Piñeyro, Omar Viera. The economic lot-sizing problem with remanufacturing and heterogeneous returns: formulations, analysis and algorithms |
3534 | -- | 3554 | Zengqiang Jiang, Shuai Yuan, Jing Ma, Qiang Wang. The evolution of production scheduling from Industry 3.0 through Industry 4.0 |
3555 | -- | 3568 | Chao Li, FaJun Yang, Lu Zhen. Efficient scheduling approaches to time-constrained single-armed cluster tools with condition-based chamber cleaning operations |
3569 | -- | 3588 | Liangqing Zhang, Hefu Liu, Zhao Cai. Addressing the consensus on information sharing in CPFR information systems: Insights from manufacturer - retailer dyads |
3589 | -- | 3605 | Adrien Rimélé, Michel Gamache, Michel Gendreau, Philippe Grangier, Louis-Martin Rousseau. Robotic mobile fulfillment systems: a mathematical modelling framework for e-commerce applications |
3606 | -- | 3629 | Mengyu He, Kai Kang, Xiuqing Mu. Impact of tax difference and asset structure on a capital-constrained vertical equity holding transnational supply chain |