Journal: Int. J. Prod. Res.

Volume 60, Issue 5

1439 -- 1457Lei Guan, Jun Pei, Xinbao Liu, Zhiping Zhou, Panos M. Pardalos. Ridesharing in urban areas: multi-objective optimisation approach for ride-matching and routeing with commuters' dynamic mode choice
1458 -- 1477Jun Wang, Rahul Rai. Generative design of conformal cubic periodic cellular structures using a surrogate model-based optimisation scheme
1478 -- 1499Hongping Li, Gongbing Bi, Wen Song, Xiaoyong Yuan. Trade credit insurance: insuring strategy of the retailer and the manufacturer
1500 -- 1519Shenghai Zhou, Qing Yue. Sequencing and scheduling appointments for multi-stage service systems with stochastic service durations and no-shows
1520 -- 1534Timothy L. Urban. Component ordering policies for selective assembly
1535 -- 1552Tobias Mönch, Arnd Huchzermeier, Peter Bebersdorf. Variable takt time groups and workload equilibrium
1553 -- 1568Vincent Hovelaque, Jean-Laurent Viviani, Mohamed Ait Mansour. Trade and bank credit in a non-cooperative chain with a price-sensitive demand
1569 -- 1586Thiago Cantos Lopes, Nadia Brauner, Leandro Magatão. Assembly line balancing with fractional task allocations
1587 -- 1599Shayan Tavakoli Kafiabad, Masoumeh Kazemi Zanjani, Mustapha Nourelfath. Workforce training and operations planning for maintenance centres under demand uncertainty
1600 -- 1620Yong Jae Kim, Jae-Won Jang, David S. Kim, Byung-Soo Kim. Batch loading and scheduling problem with processing time deterioration and rate-modifying activities
1621 -- 1632Merve Ozen, Ananth Krishnamurthy. G-network models to support planning for disaster relief distribution
1633 -- 1649Qiao Wu, Naiming Xie, Shaoxiang Zheng. Integrated cross-supplier order and logistic scheduling in cloud manufacturing
1650 -- 1665Minh-Phuoc Doan, Julien Fondrevelle, Valerie Botta-Genoulaz, J. F. Ferreira Ribeiro. Impact of flexible work contracts and multi-skilled agents on a multi-objective workforce planning problem
1666 -- 1687Lama Moussawi-Haidar, Hoda Daou, Khalil Khalil. Joint reserve stock and just-in-time inventory under regular preventive maintenance and random disruptions
1688 -- 1708Junkai He, Feng Chu, Alexandre Dolgui, Feifeng Zheng, Ming Liu 0008. Integrated stochastic disassembly line balancing and planning problem with machine specificity
1709 -- 1736Chen Hu, Yongbo Xiao, Jianbin Li. Immediate sale or stock-up: value of rent-to-own contracts for experience goods
1737 -- 1766Xuehong Gao, Guozhong Huang, Qiuhong Zhao, Cejun Cao, Huiling Jiang. Robust optimization model for medical staff rebalancing problem with data contamination during COVID-19 pandemic