2057 | -- | 2085 | Fuli Xiong, Siyuan Chen, Zongfang Ma, Linlin Li. Approximate model and algorithms for precast supply chain scheduling problem with time-dependent transportation times |
2086 | -- | 2104 | Serhat Saylam, Melih Çelik, Haldun Süral. The min-max order picking problem in synchronised dynamic zone-picking systems |
2105 | -- | 2128 | Dirk Briskorn, Lena Rotfuß, Marcel Helmdach. Modelling and optimising the capacity and production network planning in plastics processing factories |
2129 | -- | 2146 | Elham Taghizadeh 0002, Saravanan Venkatachalam. Two-stage risk-averse stochastic programming approach for multi-item single source ordering problem: CVaR minimisation with transportation cost |
2147 | -- | 2161 | Jin Xie, Xinyu Li 0001, Liang Gao 0001, Lin Gui. A new neighbourhood structure for job shop scheduling problems |
2162 | -- | 2177 | Mahdi Abolghasemi, Bahman Rostami Tabar, Aris A. Syntetos. The value of point of sales information in upstream supply chain forecasting: an empirical investigation |
2178 | -- | 2189 | Alessandro Agnetis, Marco Pranzo. Sequencing two classes of jobs on a machine with an external no-idle constraint |
2190 | -- | 2213 | Sylvain Chabanet, Hind Bril El Haouzi, Michael Morin, Jonathan Gaudreault, Philippe Thomas 0001. Toward digital twins for sawmill production planning and control: benefits, opportunities, and challenges |
2214 | -- | 2230 | Carlos J. Pérez-González, Arturo J. Fernández, Vicent Giner-Bosch, Andrés Carrión-García. Optimal repetitive reliability inspection of manufactured lots for lifetime models using prior information |
2231 | -- | 2249 | Gabriel Lyon, Alejandro Cataldo, Gustavo Angulo, Pablo A. Rey, Antoine Sauré. A column generation approach to intraday scheduling of chemotherapy patients |
2250 | -- | 2266 | Wei Liang, Zeqiang Zhang, Yu Zhang, Peiyu Xu, Tao Yin. Improved social spider algorithm for partial disassembly line balancing problem considering the energy consumption involved in tool switching |
2267 | -- | 2287 | Ramin Ahmed, H. Sebastian Heese, Michael Kay. Designing a manufacturing network with additive manufacturing using stochastic optimisation |
2288 | -- | 2306 | G. Castañé, Alexandre Dolgui, N. Kousi, B. Meyers, S. Thevenin, E. Vyhmeister, Per-Olov Östberg. The ASSISTANT project: AI for high level decisions in manufacturing |
2307 | -- | 2321 | Hongfei Guo, Linsheng Zhang, Yaping Ren, Yun Li, Zhongwei Zhou, Jianzhao Wu. Optimizing a stochastic disassembly line balancing problem with task failure via a hybrid variable neighborhood descent-artificial bee colony algorithm |
2322 | -- | 2338 | Youssef Lahrichi, David Damand, Laurent Deroussi, Nathalie Grangeon, Sylvie Norre. Investigating two variants of the sequence-dependent robotic assembly line balancing problem by means of a split-based approach |
2339 | -- | 2371 | Swapnil Bhalla, Erlend Alfnes, Hans-Henrik Hvolby. Tools and practices for tactical delivery date setting in engineer-to-order environments: a systematic literature review |
2372 | -- | 2401 | Bilge Torbali, Gülgün Alpan. A literature review on robust and real-time models for cross-docking |