1063 | -- | 1076 | Daniele Scrimieri, Robert F. Oates, Svetan M. Ratchev. Learning and reuse of engineering ramp-up strategies for modular assembly systems |
1077 | -- | 1083 | Qiang Liu, Chengen Wang. A graph-based pipe routing algorithm in aero-engine rotational space |
1085 | -- | 1098 | Amir Jalilvand-Nejad, Parviz Fattahi. A mathematical model and genetic algorithm to cyclic flexible job shop scheduling problem |
1099 | -- | 1112 | Jeng-Fung Chen. Unrelated parallel-machine scheduling to minimize total weighted completion time |
1113 | -- | 1120 | Gao Xiang, Wang Hua, Chen Guanlong. Curve fitting optimization based on a mixed model for assembly applications |
1121 | -- | 1129 | Rupesh Kumar Pandey, Sudhansu Sekhar Panda. Optimization of bone drilling using Taguchi methodology coupled with fuzzy based desirability function approach |
1131 | -- | 1144 | Vipul Jain, Anirban Kundu, Felix T. S. Chan, Mukesh Patel. A Chaotic Bee Colony approach for supplier selection-order allocation with different discounting policies in a coopetitive multi-echelon supply chain |
1145 | -- | 1159 | Peng Yang, Lixin Miao, Zhaojie Xue, Lei Qin. An integrated optimization of location assignment and storage/retrieval scheduling in multi-shuttle automated storage/retrieval systems |
1161 | -- | 1180 | Wen-An Yang, Wei Zhou. Autoregressive coefficient-invariant control chart pattern recognition in autocorrelated manufacturing processes using neural network ensemble |
1181 | -- | 1199 | Yuanhang Wang, Chao Deng, Jun Wu, Yao Xiong. Failure time prediction for mechanical device based on the degradation sequence |
1201 | -- | 1215 | Juan José Palacios, Inés González Rodríguez, Camino R. Vela, Jorge Puente. Swarm lexicographic goal programming for fuzzy open shop scheduling |
1217 | -- | 1232 | Asif Iqbal, Hong-Chao Zhang, Lu Lu Kong, Ghulam Hussain. A rule-based system for trade-off among energy consumption, tool life, and productivity in machining process |
1233 | -- | 1245 | Ci Chen, Beixin Xia, Bing-Hai Zhou, Lifeng Xi. A reinforcement learning based approach for a multiple-load carrier scheduling problem |
1247 | -- | 1252 | Azizah Binti Mohamad, Azlan Mohd Zain, Nor Erne Nazira Bazin, Amirmudin Udin. A process prediction model based on Cuckoo algorithm for abrasive waterjet machining |
1253 | -- | 1266 | Bo Jiao, Ying Zhou, Jing Du, Chengdong Huang, Jun-hu Wang, Bo Li. A heuristic nonlinear operator for the aggregation of incomplete judgment matrices in group decision making |
1267 | -- | 1279 | Minhoe Hur, Seung Kyung Lee, Bongseok Kim, Sungzoon Cho, Dongha Lee, Daehyung Lee. A study on the man-hour prediction system for shipbuilding |
1281 | -- | 1290 | Debiao Li, Venkatesh Raghavan, Sang-Won Yoon. Implementation of web-based manufacturing process aid in the electronic assembly shop floor |