Journal: JORS

Volume 59, Issue 4

421 -- 422Khairy Kobbacy, Sunil Vadera. Editorial
423 -- 430A. Chan, K. R. McNaught. Using Bayesian networks to improve fault diagnosis during manufacturing tests of mobile telephone infrastructure
431 -- 442Reza Tavakkoli-Moghaddam, Nima Safaei, M. M. O. Kah. Accessing feasible space in a generalized job shop scheduling problem with the fuzzy processing times: a fuzzy-neural approach
443 -- 454Reza Tavakkoli-Moghaddam, Nima Safaei, Farrokh Sassani. A new solution for a dynamic cell formation problem with alternative routing and machine costs using simulated annealing
455 -- 463A. Lawrynowicz. Integration of production planning and scheduling using an expert system and a genetic algorithm
464 -- 472Farid Meziane, Mohd Khairudin Kasiran. Evaluating trust in electronic commerce: a study based on the information provided on merchants' websites
473 -- 481John E. Boylan, Aris A. Syntetos, G. C. Karakostas. Classification for forecasting and stock control: a case study
482 -- 493J. Antony, M. Kumar, A. Labib. Gearing Six Sigma into UK manufacturing SMEs: results from a pilot study
494 -- 502M. Pearson. Prioritizing edge over node: process control in supply chain networks and push-pull strategies
503 -- 509M. Alardhi, A. W. Labib. Preventive maintenance scheduling of multi-cogeneration plants using integer programming
510 -- 520S. Karabuk. Production planning under uncertainty in textile manufacturing
521 -- 539Y. Shim, S. A. Gabriel, A. Desai, P. Sahakij, S. Milner. A fast heuristic method for minimizing traffic congestion on reconfigurable ring topologies
540 -- 547David Soler, Eulalia Martínez, Joan C. Micó. A transformation for the mixed general routing problem with turn penalties
548 -- 555C. Lin, Y. T. Lin. Robust analysis on promotion duration for two competitive brands
556 -- 562Filipa D. Carvalho, Maria Teresa Almeida. A three-phase algorithm for the cell suppression problem in two-dimensional statistical tables
563 -- 570Deniz Nadirler, Esra Köktener Karasakal. Mixed integer programming-based solution procedure for single-facility location with maximin of rectilinear distance
571 -- 573T. Williams, J. Wilson. JORS Referees 2007