381 | -- | 383 | Cengiz Kahraman. Preface: A Special Issue on Extensions of Ordinary Fuzzy Sets with Theory and Applications |
385 | -- | 399 | Krassimir T. Atanassov. Extended Temporal-level Operator Over Intuitionistic Fuzzy Sets |
401 | -- | 443 | Sezi Çevik Onar, Basar Öztaysi, Cengiz Kahraman. A Comparison of Fuzzy Extensions of TOPSIS Method: Evaluating Creative Thinking Tool Alternatives |
445 | -- | 462 | Vladik Kreinovich, Olga Kosheleva. How to Take All Available Information into Account in Fuzzy Decision Making: Beyond Traditional "And" - and "Or" - Operations |
463 | -- | 484 | Michinori Nakata, Norio Saito, Hiroshi Sakai, Takeshi Fujiwara. Rough Sets and Rule Induction by an Approach Based on Coverings in Information Tables |
485 | -- | 503 | Nursah Alkan, Cengiz Kahraman. Evaluation of Success Factors and Challenges of Smart Agriculture Using Interval Valued Intuitionistic Fuzzy AHP |
505 | -- | 538 | Yinsheng Zhang. Harmonization, Dualization and Globalization of Categorical Propositions |
539 | -- | 559 | Ewa Marchwicka, Dorota Kuchta. Critical Path for Projects with Activity Durations Modelled as Z-Fuzzy Numbers |
561 | -- | 590 | Abdullah Hulusi Kökçam, Orhan Engin. A Hybrid Algorithm for Solving Resource-Constrained Project Scheduling Problems with Fuzzy Activity Durations: An Application in Disc Mower Manufacturing Project |
591 | -- | 613 | Lucio Amézquita, Oscar Castillo 0001, José Soria, Prometeo Cortés Antonio. Fuzzy Logic Augmentation of the Multiverse Optimizer Applied to Fuzzy Controllers Design |
615 | -- | 635 | Cengiz Kahraman, Basar Öztaysi, Sezi Çevik Onar. A Novel Interval Valued Picture Fuzzy TOPSIS Method: Application on Supplier Selection |