167 | -- | 169 | George Liberopoulos, C. T. Papadopoulos, Baris Tan, J. MacGregor Smith, Stanley B. Gershwin. Stochastic models for the design, coordination, and control of manufacturing systems |
171 | -- | 193 | J. MacGregor Smith. Dilemmas in factory design: paradox and paradigm |
195 | -- | 219 | Emre Enginarlar, Jingshan Li, Semyon M. Meerkov. Lean buffering in serial production lines with non-exponential machines |
221 | -- | 242 | Stefan Helber. Analysis of flow lines with Cox-2-distributed processing times and limited buffer capacity |
243 | -- | 263 | Marcello Colledani, Andrea Matta, Tullio Tolio. Performance evaluation of production lines with finite buffer capacity producing two different products |
265 | -- | 286 | Andrea Matta, M. Runchina, Tullio Tolio. Automated flow lines with shared buffer |
287 | -- | 314 | Jong-Yoon Kim, Stanley B. Gershwin. Integrated quality and quantity modeling of a production line |
315 | -- | 338 | Marcel van Vuuren, Ivo J. B. F. Adan, Simone A. E. Resing-Sassen. Performance analysis of multi-server tandem queues with finite buffers and blocking |
339 | -- | 368 | Stelios Koukoumialos, George Liberopoulos. An analytical method for the performance evaluation of echelon kanban control systems |
369 | -- | 398 | Lieneke Spanjers, Jan-Kees C. W. van Ommeren, W. H. M. Zijm. Closed loop two-echelon repairable item systems |
399 | -- | 434 | Pieter L. M. van Nyen, J. Will M. Bertrand, Henny P. G. van Ooijen, Nico J. Vandaele. A heuristic to control integrated multi-product multi-machine production-inventory systems with job shop routings and stochastic arrival, set-up and processing times |
435 | -- | 457 | John Geraghty, Cathal Heavey. A review and comparison of hybrid and pull-type production control strategies |
459 | -- | 470 | Sven Axsäter. Planning order releases for an assembly system with random operation times |
471 | -- | 489 | Isil Yildirim, Baris Tan, Fikri Karaesmen. A multiperiod stochastic production planning and sourcing problem with service level constraints |