Journal: Int. J. Systems Assurance Engineering and Management

Volume 2, Issue 4

261 -- 281Sirsendu Mohanta, Gopika Vinod, Rajib Mall. A technique for early prediction of software reliability based on design metrics
282 -- 285Ajit Kumar Verma, Ajit Srividya, Anil Rana. Approximation of MTTF calculation of a non-stationary gamma wear process
286 -- 300Alex Francisque, Manuel J. Rodríguez, Rehan Sadiq, Luis F. Miranda, François Proulx. Classification of heterotrophic plate counts (HPC) in a water distribution network: a fuzzy rule-based approach
301 -- 311Mohit Singh, I. A. Khan, Sandeep Grover. Selection of manufacturing process using graph theoretic approach
312 -- 318V. Ebrahimipur, S. F. Qurayshi, A. Shabani, B. Maleki-Shoja. n systems by fuzzy mathematical programming and genetic algorithm
319 -- 324S. S. Rane, Ajit Srividya, Ajit Kumar Verma. Taguchi methods and finite element methods in reliability based crashworthiness and risk analysis of motorcycle frame
325 -- 332Acácio M. R. Amaral, A. J. Marques Cardoso. Condition monitoring of electrolytic capacitors
333 -- 341Salvatore Distefano. The standby engineering: classification and quantification of standby in reliability

Volume 2, Issue 3

193 -- 204Kuldeep Kumar, Pawan Kumar. Fuzzy availability modeling and analysis of biscuit manufacturing plant: a case study
205 -- 217Abbas Barabadi, Tore Markeset. Reliability and maintainability performance under Arctic conditions
218 -- 225Dina Kayrbekova, Tore Markeset, Behzad Ghodrati. Activity-based life cycle cost analysis as an alternative to conventional LCC in engineering design
226 -- 233Wenjian Li, Hoang Pham. A condition-based maintenance model for periodically inspected systems subjected to competing failure processes
234 -- 240G. Srinivas, Ajit Kumar Verma, Ajit Srividya, Sanjay Kumar Khattri. A level-1 PSA based systemic approach to optimal technical specifications of safety systems in nuclear power plants
241 -- 252Ajit Kumar Verma, Ajit Srividya, Anil Rana. Optimal time scheduling for carrying out minor maintenance on a steam turbine
253 -- 259Yaping Wang, Hoang Pham. Analyzing the effects of air pollution and mortality by generalized additive models with robust principal components

Volume 2, Issue 2

85 -- 96Mutum Zico Meetei, Anita Goel, Siri Krishan Wasan. Observability using aspect-oriented programming for OO software testing
97 -- 113Bernhard Beckert, Christoph Gladisch, Shmuel S. Tyszberowicz, Amiram Yehudai. KeYGenU: combining verification-based and capture and replay techniques for regression unit testing
114 -- 125Ossi Taipale, Jussi Kasurinen, Katja Karhu, Kari Smolander. Trade-off between automated and manual software testing
126 -- 134Renée C. Bryce, Sreedevi Sampath, Jan B. Pedersen, Schuyler Manchester. Test suite prioritization by cost-based combinatorial interaction coverage
135 -- 143Qichang Chen, Liqiang Wang, Zijiang Yang. HEAT: a combined approach for thread escape analysis
144 -- 154David Faitelson, Shmuel S. Tyszberowicz. Data refinement based testing
155 -- 162Shinji Inoue, Shigeru Yamada. Software reliability measurement with effect of change-point: modeling and application
163 -- 168Jan Lundberg, Alf Bohlin, Malin Syk. Capacity test of ultrasonic equipment used for crack detection in railway application
169 -- 182Jan Lundberg, Alf Bohlin, Malin Syk. Blindfold tests on manganese crossing in railway application
183 -- 192Anil Rana, Ajit Kumar Verma, Ajit Srividya. Use of petrinets for solution of a stern gland optimal inspection interval problem

Volume 2, Issue 1

1 -- 2Lotfi A. Zadeh, Ajit Kumar Verma, Ashok Deshpande. Editorial
3 -- 13Ashok Deshpande. Fuzzy fault tree analysis: revisited
14 -- 20Ajit Kumar Verma, Ajit Srividya, P. G. Ramesh. FIS based selection of CM system design parameters from a multi-objective optimisation model using GA
21 -- 30Yongjun Shen, Da Ruan, Elke Hermans, Tom Brijs, Geert Wets, Koen Vanhoof. Modeling qualitative data in data envelopment analysis for composite indicators
31 -- 40Samiran Das, Rehan Sadiq, Solomon Tesfamariam. An aggregative fuzzy risk analysis for flood incident management
41 -- 47Ajeet Kumar Pandey, Vivek Shrivastava. Early fault detection model using integrated and cost-effective test case prioritization
48 -- 58P. K. Kapur, Hoang Pham, Anshu Gupta, P. C. Jha. Optimal release policy under fuzzy environment
59 -- 65Francisco Luiz de Lemos, Terrence M. Sullivan. Addressing epistemic uncertainty in a radioactive waste disposal facility siting: examples of applications
66 -- 77Yaping Wang, Hoang Pham. Imperfect preventive maintenance policies for two-process cumulative damage model of degradation and random shocks
78 -- 83Hla Myo Tun, Marlar Kyaw, Zaw Min Naing. Development of process monitoring system in drilling process using fuzzy rules