| 221 | -- | 223 | Jacek Blazewicz, Valter Boljuncic, Silvano Martello, Jadranka Skorin-Kapov. Combinatorial optimization issues in scheduling |
| 225 | -- | 237 | Alessandro Agnetis, Marta Flamini, Gaia Nicosia, Andrea Pacifici. A job-shop problem with one additional resource type |
| 239 | -- | 256 | Peter Brucker, Natalia V. Shakhlevich. Inverse scheduling: two-machine flow-shop problem |
| 257 | -- | 265 | Imed Kacem, Hans Kellerer. Fast approximation algorithms to minimize a special weighted flow-time criterion on a single machine with a non-availability interval and release dates |
| 267 | -- | 279 | Vladimir Kats, Eugene Levner. Parametric algorithms for 2-cyclic robot scheduling with interval processing times |
| 281 | -- | 290 | Kazuki Matsumoto, Shunji Umetani, Hiroshi Nagamochi. On the one-dimensional stock cutting problem in the paper tube industry |
| 291 | -- | 306 | Marek Mika, Grzegorz Waligóra, Jan Weglarz. Modelling and solving grid resource allocation problem with network resources for workflow applications |