Journal: J. Scheduling

Volume 14, Issue 5

407 -- 0Jacek Blazewicz, Maciej Drozdowski, Graham Kendall, Barry McCollum. Preface
409 -- 421Jason A. D. Atkin, Edmund K. Burke, John S. Greenwood. A comparison of two methods for reducing take-off delay at London Heathrow airport
423 -- 434Raymond S. K. Kwan. Case studies of successful train crew scheduling optimisation
435 -- 444Svetlana A. Kravchenko, Frank Werner. Parallel machine problems with equal processing times: a survey
445 -- 454Kenneth R. Baker, Dan Trietsch. Three heuristic procedures for the stochastic, two-machine flow shop problem
455 -- 469Dvir Shabtay, George Steiner. A bicriteria approach to minimize the total weighted number of tardy jobs with convex controllable processing times and assignable due dates
471 -- 481Donatas Elvikis, Horst W. Hamacher, Vincent T Kindt. Scheduling two agents on uniform parallel machines with makespan and cost functions
483 -- 500Trung Hieu Tran, Kien Ming Ng. A water-flow algorithm for flexible flow shop scheduling with intermediate buffers
501 -- 509Gilles Simonin, Benoît Darties, Rodolphe Giroudeau, Jean-Claude König. Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor
511 -- 522Abir Benabid, Claire Hanen. Worst case analysis of decomposed software pipelining for cyclic unitary RCPSP with precedence delays