| 407 | -- | 0 | Jacek Blazewicz, Maciej Drozdowski, Graham Kendall, Barry McCollum. Preface |
| 409 | -- | 421 | Jason A. D. Atkin, Edmund K. Burke, John S. Greenwood. A comparison of two methods for reducing take-off delay at London Heathrow airport |
| 423 | -- | 434 | Raymond S. K. Kwan. Case studies of successful train crew scheduling optimisation |
| 435 | -- | 444 | Svetlana A. Kravchenko, Frank Werner. Parallel machine problems with equal processing times: a survey |
| 445 | -- | 454 | Kenneth R. Baker, Dan Trietsch. Three heuristic procedures for the stochastic, two-machine flow shop problem |
| 455 | -- | 469 | Dvir Shabtay, George Steiner. A bicriteria approach to minimize the total weighted number of tardy jobs with convex controllable processing times and assignable due dates |
| 471 | -- | 481 | Donatas Elvikis, Horst W. Hamacher, Vincent T Kindt. Scheduling two agents on uniform parallel machines with makespan and cost functions |
| 483 | -- | 500 | Trung Hieu Tran, Kien Ming Ng. A water-flow algorithm for flexible flow shop scheduling with intermediate buffers |
| 501 | -- | 509 | Gilles Simonin, Benoît Darties, Rodolphe Giroudeau, Jean-Claude König. Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor |
| 511 | -- | 522 | Abir Benabid, Claire Hanen. Worst case analysis of decomposed software pipelining for cyclic unitary RCPSP with precedence delays |