| 119 | -- | 129 | Frans Schalekamp, René Sitters, Suzanne van der Ster, Leen Stougie, Víctor Verdugo, Anke van Zuylen. Split scheduling with uniform setup times |
| 131 | -- | 145 | Alewyn P. Burger, C. G. Jacobs, Jan H. van Vuuren, S. E. Visagie. Scheduling multi-colour print jobs with sequence-dependent setup times |
| 147 | -- | 153 | J. J. Yuan, C. T. Ng, T. C. Edwin Cheng. Two-agent single-machine scheduling with release dates and preemption to minimize the maximum lateness |
| 155 | -- | 163 | Edward G. Coffman Jr., C. T. Ng, Vadim G. Timkovsky. How small are shifts required in optimal preemptive schedules? |
| 165 | -- | 184 | Troels Martin Range, Richard Martin Lusby, Jesper Larsen. Solving the selective multi-category parallel-servicing problem |
| 185 | -- | 194 | Tianping Shuai, Donglei Du, Xiaoyue Jiang. On-line preemptive machine scheduling with $$\ell _p$$ ℓ p norm on two uniform machines |
| 195 | -- | 205 | Claude Yugma, Jakey Blue, Stéphane Dauzère-Pérès, Ali Obeid. Integration of scheduling and advanced process control in semiconductor manufacturing: review and outlook |
| 207 | -- | 223 | Sana Dahmen, Monia Rekik. Solving multi-activity multi-day shift scheduling problems with a hybrid heuristic |