Journal: J. Scheduling

Volume 18, Issue 3

225 -- 241Christian Artigues, Pierre Lopez. Energetic reasoning for energy-constrained scheduling with a continuous resource
243 -- 261Alessandro Agnetis, Gaia Nicosia, Andrea Pacifici, Ulrich Pferschy. Scheduling two agent task chains with a central selection mechanism
263 -- 273Stefan Creemers. Minimizing the expected makespan of a project with stochastic activity durations under resource constraints
275 -- 284Zdenek Hanzálek, Claire Hanen. The impact of core precedences in a cyclic RCPSP with precedence delays
285 -- 298Jian-Jun Qi, Yajie Liu, Ping Jiang, Bo Guo. Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization
299 -- 304Odile Bellenguez-Morineau, Marek Chrobak, Christoph Dürr, Damien Prot. A note on NP-hardness of preemptive mean flow-time scheduling for parallel machines
305 -- 309Kenneth R. Baker, Dan Trietsch. Trading off due-date tightness and job tardiness in a basic scheduling model
311 -- 314Alan J. Soper. A cyclical search for the two machine flow shop and open shop to minimise finishing time
315 -- 323Long Wan, Jinjiang Yuan, Zhichao Geng. A note on the preemptive scheduling to minimize total completion time with release time and deadline constraints
325 -- 327James D. Blocher, Sergey Sevastyanov. A note on the Coffman-Sethi bound for LPT scheduling
329 -- 0Dvir Shabtay, Nufar Gaspar, Moshe Kaspi. Erratum to: A survey on offline scheduling with rejection
331 -- 0Jaehwan Yang, Marc E. Posner. Erratum to: Flow shops with WIP and value added costs