Journal: J. Scheduling

Volume 22, Issue 6

607 -- 621Simon Emde, Lukas Polten. Sequencing assembly lines to facilitate synchronized just-in-time part supply
623 -- 634Péter Györgyi, Tamás Kis. Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints
635 -- 661Sigrid Knust, Natalia V. Shakhlevich, Stefan Waldherr, Christian Weiß. Shop scheduling problems with pliable jobs
663 -- 676Danny Hermelin, Dvir Shabtay, Nimrod Talmon. On the parameterized tractability of the just-in-time flow-shop scheduling problem
677 -- 689Wei Wei. Single machine scheduling with stochastically dependent times
691 -- 707Wenchang Luo, Yao Xu, Weitian Tong, Guohui Lin. Single-machine scheduling with job-dependent machine deterioration
709 -- 714Tianyu Wang, Odile Bellenguez-Morineau. A complexity analysis of parallel scheduling unit-time jobs with in-tree precedence constraints while minimizing the mean flow time