| 607 | -- | 621 | Simon Emde, Lukas Polten. Sequencing assembly lines to facilitate synchronized just-in-time part supply |
| 623 | -- | 634 | Péter Györgyi, Tamás Kis. Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints |
| 635 | -- | 661 | Sigrid Knust, Natalia V. Shakhlevich, Stefan Waldherr, Christian Weiß. Shop scheduling problems with pliable jobs |
| 663 | -- | 676 | Danny Hermelin, Dvir Shabtay, Nimrod Talmon. On the parameterized tractability of the just-in-time flow-shop scheduling problem |
| 677 | -- | 689 | Wei Wei. Single machine scheduling with stochastically dependent times |
| 691 | -- | 707 | Wenchang Luo, Yao Xu, Weitian Tong, Guohui Lin. Single-machine scheduling with job-dependent machine deterioration |
| 709 | -- | 714 | Tianyu Wang, Odile Bellenguez-Morineau. A complexity analysis of parallel scheduling unit-time jobs with in-tree precedence constraints while minimizing the mean flow time |