| 525 | -- | 538 | Jinwen Ou. Near-linear-time approximation algorithms for scheduling a batch-processing machine with setups and job rejection |
| 539 | -- | 554 | Tristan Becker. A decomposition heuristic for rotational workforce scheduling |
| 555 | -- | 574 | Bruno Gaujal, Alain Girault, Stéphan Plassart. Dynamic speed scaling minimizing expected energy consumption for real-time tasks |
| 575 | -- | 593 | Christoph Hertrich, Christian Weiß, Heiner Ackermann, Sandy Heydrich, Sven O. Krumke. Scheduling a proportionate flow shop of batching machines |
| 595 | -- | 608 | Jianming Dong, Joshua Chang, Bing Su, Jueliang Hu, Guohui Lin. Two-stage open-shop scheduling with a two-machine flow shop as a stage: approximation algorithms and empirical experiments |
| 609 | -- | 617 | Cheng He, Chunqi Xu, Hao Lin. Serial-batching scheduling with two agents to minimize makespan and maximum cost |
| 619 | -- | 628 | Byung-Cheon Choi, Myoung-Ju Park. Scheduling two projects with controllable processing times in a single-machine environment |