Journal: J. Scheduling

Volume 24, Issue 4

367 -- 380Dirk Briskorn. Routing two stacking cranes with predetermined container sequences
381 -- 403Marek Chrobak, Mordecai J. Golin, Tak Wah Lam, Dorian Nogneng. Scheduling with gaps: new models and algorithms
405 -- 412Antonina P. Khramova, Ilya Chernykh. A new algorithm for the two-machine open shop and the polynomial solvability of a scheduling problem with routing
413 -- 429Luis F. Machado-Domínguez, Carlos D. Paternina-Arboleda, Jorge I. Vélez, Agustín Barrios Sarmiento. A memetic algorithm to address the multi-node resource-constrained project scheduling problem
431 -- 446Arman Jabbari, Philip M. Kaminsky. Online scheduling to minimize total weighted (modified) earliness and tardiness cost
447 -- 454Yuan Zhang, Jinjiang Yuan. A note on the complexity of two supply chain scheduling problems