Journal: J. Scheduling

Volume 26, Issue 4

335 -- 351Niloy J. Mukherjee, Subhash C. Sarin, Daniel A. Neira. Lot streaming for a two-stage assembly system in the presence of handling costs
353 -- 367Mats Carlsson, Sara Ceschia, Luca Di Gaspero, Rasmus Ø. Mikkelsen, Andrea Schaerf, Thomas Jacob Riis Stidsen. Exact and metaheuristic methods for a real-world examination timetabling problem
369 -- 382Matthias Bentert, Robert Bredereck, Péter Györgyi, Andrzej Kaczmarczyk 0001, Rolf Niedermeier. A multivariate complexity analysis of the material consumption scheduling problem
383 -- 398Fangfang Wu, Zhongyi Jiang, Run Zhang, Xiandong Zhang. Approximation algorithms for scheduling monotonic moldable tasks on multiple platforms
399 -- 402Murat Güngör. A note on the shifting bottleneck procedure for job shop scheduling
403 -- 409Enrique Gerstl, Gur Mosheiov. A note: maximizing the weighted number of Just-in-Time jobs for a given job sequence