Scheduling with tool changes to minimize total completion time: Basic results and SPT performance

M. Selim Akturk, Jay B. Ghosh, Evrim D. Gunes. Scheduling with tool changes to minimize total completion time: Basic results and SPT performance. European Journal of Operational Research, 157(3):784-790, 2004. [doi]

@article{AkturkGG04,
  title = {Scheduling with tool changes to minimize total completion time: Basic results and SPT performance},
  author = {M. Selim Akturk and Jay B. Ghosh and Evrim D. Gunes},
  year = {2004},
  doi = {10.1016/S0377-2217(03)00232-7},
  url = {http://dx.doi.org/10.1016/S0377-2217(03)00232-7},
  researchr = {https://researchr.org/publication/AkturkGG04},
  cites = {0},
  citedby = {0},
  journal = {European Journal of Operational Research},
  volume = {157},
  number = {3},
  pages = {784-790},
}