Scheduling with tool changes to minimize total completion time: Basic results and SPT performance

M. Selim Akturk, Jay B. Ghosh, Evrim D. Gunes. Scheduling with tool changes to minimize total completion time: Basic results and SPT performance. European Journal of Operational Research, 157(3):784-790, 2004. [doi]

Abstract

Abstract is missing.