Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times

Ali Allahverdi, Harun Aydilek. Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times. Computers & Mathematics with Applications, 60(5):1374-1384, 2010. [doi]

Abstract

Abstract is missing.